top of page
All posts Archives


Kampala’s Cleaner-Air Reading Raises a Bigger Question About Urban Dust
Removing smoky and mechanically unsafe vehicles is therefore a legitimate public-health and road-safety intervention, but Kampala cannot inspect its way out of dirty air. Large areas of exposed earth, unpaved shoulders and access roads, deteriorated surfaces, construction sites and inadequate ground cover continue to produce and re-suspend dust throughout the metropolitan area.
Erinah Kintu
Sep 5


Lira Residents Challenge Land Plans for Lira International Airport
Land at Anai was originally reserved for an airport in the 1960s, but residents say the present proposal requires a much larger footprint.
Erinah Kintu
Aug 29


Government Changes National Cleaning Day Waste Plan After First Exercise Overwhelms Collection System
The revised arrangements will test whether one month later, the lessons from the first exercise have translated into operational planning.
Erinah Kintu
Aug 29


MPs Recommend Ending Kampala–Entebbe Expressway Operating Contracts
An earlier audit review found more than 10,000 vehicle movements that could not be reconciled in toll records, while Parliament was told that approximately Shs.129 billion had been collected since tolling began against about Shs.122 billion paid to the toll-system operator.
Staff Writer
Aug 29


Mukono’s Shs4.5bn Landfill Expansion Runs Into Land and Compensation Challenges
Mukono says most of the required land has been secured, although more than Shs1.1 billion may still be required for outstanding parcels and compensation claims. Some residents dispute valuations or say payments remain incomplete.
Staff Writer
Aug 29


Mbarara Property Dialogue Signals Growing Focus on Regional Real Estate Markets
Mbarara’s expanding population, commercial role and position as a regional hub are creating new dynamics in regional real estate markets as projections predict more demand for housing, commercial property and supporting infrastructure.
Erinah Kintu
Aug 24


Ben Kiwanuka Street Closed for Major Carriageway and Drainage Works
The works form part of broader road improvements in the Greater Kampala Metropolitan Area.
Staff Writer
Aug 20


Uganda Railways Remains Loss-Making Despite Investment and Rehabilitation
Parliamentary scrutiny has also highlighted weak revenue generation, idle assets, missing wagons, rehabilitation delays and unresolved land issues.
Erinah Kintu
Aug 18


Uganda Plans First Nationwide Baseline Survey of Buildings
A proposed bidirectional petroleum-products pipeline would allow refined fuel to move between Uganda and Tanzania according to demand, while the Tanga refinery is intended to complement Uganda's planned 60,000-barrel-per-day Hoima refinery.
Staff Writer
Aug 18


Nakasongola Proposed as Future Administrative Capital
The proposal is being presented as a response to Kampala's congestion, limited room for major infrastructure expansion and longstanding spatial-planning problems.
Erinah Kintu
Aug 18


Tanga Energy Hub Plans Expand Uganda–Tanzania Petroleum Infrastructure
A proposed bidirectional petroleum-products pipeline would allow refined fuel to move between Uganda and Tanzania according to demand, while the Tanga refinery is intended to complement Uganda's planned 60,000-barrel-per-day Hoima refinery.
Erinah Kintu
Aug 18


Parliament Probes Toll-Revenue Controls on Entebbe Expressway
News Summary: Parliament's Committee on Physical Infrastructure has summoned former Works and Transport Minister Gen Edward Katumba Wamala and former UNRA Executive Director Allen Kagina over weaknesses identified in the Kampala–Entebbe Expressway tolling system. MPs reported problems including manual vehicle classification, misclassification of vehicles and system freezes that can allow vehicles through before payment is recorded. Kampala-Entebbe Expressway; Source: MOWT Con
Staff Writer
Aug 17
bottom of page
.png)