Latest Prices: Materials, Machinery & Manpower 

Data-first market intelligence for the construction industry

Construction Site Resources

USD/UGX Rate: 3650

DALL·E 2025-10-24 00.15.56 - A realistic collage of construction materials arranged in an
openart-image_IiT6DynH_1761675560127_raw.jpg
WhatsApp Image 2025-09-28 at 23_edited.j

Materials:

Ref
Item / Description
Specification / Basis
Unit
Indicative Rate (UGX)
A
CEMENT & BINDERS
A01
Cement
CEM I 42.5 N – OPC, Tororo
50 kg bag

42,000 – 46,000/=

A02
Cement
Portland Pozzolana 42.5 N – PPC
50 kg bag

40,000 – 42,000/=

A03
Cement
Portland Pozzolana – Tororo (Black)
50 kg bag

32,000 – 35,000/=

A04
Cement
Portland Pozzolana – Hima
50 kg bag

33,000 – 35,000/=

A05
Cement
CEM II B(P) 32.5 R – Tororo (Red)
50 kg bag

33,000 – 36,000/=

A06
Cement
CEM II B(P) 32.5 R – Hima
50 kg bag

33,000 – 36,000/=

A07
Hydrated Lime
Building lime
25 kg bag

28,000 - 30,000/=

B
REINFORCEMENT & STEEL
B01
Round Bar
6 mm
Pc.

7,000 – 9,000/=

B02
Round Bar
8 mm
Pc.

16,000 – 18,000/=

B03
High Tensile Rebar
8mm
Pc.

20,000 – 22,000/=

B04
High Tensile Rebar
10mm
Pc.

30,000 – 32,000/=

B05
High Tensile Rebar
12mm
Pc.

38,000 – 40,000/=

B06
High Tensile Rebar
16mm
Pc.

68,000 – 72,000/=

B07
High Tensile Rebar
20mm
Pc.

130,000 – 138,000/=

B08
High Tensile Rebar
25mm
Pc.

200,000 – 210,000/=

B09
Binding Wire
20 kg roll
Roll

115,000 – 125,000/=

B10
Binding Wire
1 kg
Kg

6,500 – 7,500/=

C
AGGREGATES & CONCRETE INPUTS
C01
Building Sand (Lake)
ELF truck
Load

160,000 – 200,000/=

C02
Building Sand (Lake)
Forward truck
Load

300,000 – 350,000/=

C03
Building Sand (Lake)
Sinotruk
Load

1,800,000 – 2,100,000/=

C04
Plaster Sand
ELF truck
Load

140,000 – 160,000/=

C05
Plaster Sand
Forward truck
Load

230,000 – 280,000/=

Plant (Machinery & Tools) : Rate / Day 

Ref
Equipment / Plant
Capacity / Description
Indicative Rate (UGX)
Notes
E01
Excavator
20–22 ton

1,000,000–1,400,000/=

Dry lease; operator included.
E02
Backhoe Loader
e.g. JCB 3CX / CAT 428

450,000 – 550,000/=

Dry lease; operator included.
E03
Tipper Truck
10–15 ton

350,000 – 500,000/=

Dry lease; driver included; Excludes haul-distance effects
E04
Total Station
Wet lease; Electronic, with accessories

300,000–450,000/= 

Includes Instrument Person/Surveyor + target team & equipment.
E05
Water Pump
3-inch, diesel

50,000–80,000/=

Dry lease; excludes hoses (may attract a small accessory add-on).
E06
Poker Vibrator
Mechanical/petrol

40,000–60,000/=

Dry lease; customer handles petrol/oil mix.
E07
Concrete Mixer
1 bag / 200L

60,000–80,000/=

Petrol/Diesel driven, mobile site towable. Excludes operator/fue
E08
Concrete Mixer
1.5 bag / 300–350L

100,000–120,000/=

Heavy-duty mobile mixer. Excludes operator/fuel.
E09
Concrete Mixer
2 bag / 400–500L

120,000–160,000/= 

Self-loading or standard drum option. Excludes fuel.
E10
Plate Compactor
Walk-behind

50,000 – 70,000/=

Dry lease
E11
Pedestrian Roller
Small Compaction Roller; (Single/Twin drum, ~1-2 ton)

180,000 – 250,000/=

Dry lease; excludes transportation to site.
E12
Material Hoist
Site Hoist (500kg–1 Ton capacity)

150,000 – 200,000/=

Typically hired on a weekly/monthly block on structural sites.
E13
Chain Block
Manual lifting equipment

25,000 – 35,000/=

Bare tool rental.
E14
Motor Grader
Standard roadworks grader

-

TBC
E15
Wheel Loader
Medium construction loader

-

TBC

Personnel:

Ref
Personnel / Trade
Classification / Basis
Rate Unit
Indicative Rate (UGX)
Notes
P01
General Labourer / Porter
General site labour
Per day
12,000–20,000/=
Dependent on availability, complexity and/or location etc.
P02
Gangman / Head Porter
General site labour
Per day
25,000–30,000/=
Dependent on availability, complexity and/or location etc.
P03
Mason / Bricklayer
Skilled site labour
Per day
25,000–30,000/=
Dependent on availability, complexity and/or location etc.
P04
Carpenter / Formworker
Skilled trade
Per day / output
-
Often scope/output based
P05
Steel Fixer
Skilled trade
Per day / output
-
Often scope/output based
P06
Plumber
Skilled trade
Per day / output
-
Scope dependent
P07
Electrician
Skilled trade
Per day / output
-
Scope dependent
P08
Painter
Skilled trade
Per day / output
-
Depends on preparation/system
P09
Tiler
Floor tiling, standard ceramic/porcelain
Per sqm
8,000–12,000/=
P10
Tiler
Large-format porcelain/granite
Per sqm
15,000–18,000/=
P11
Foreman / Site Supervisor
Weekly engagement
Per week
250,000–400,000/=
P12
Foreman / Site Supervisor
Monthly engagement
Per month
1,200,000–2,200,000/=
P13
Site Engineer
Junior / contract
Per month
1,500,000–2,500,000/=
P14
Site Engineer
Senior / RE
Per month
3,500,000–6,000,000/=

Disclaimer: Prices are compiled from supplier websites, catalogues, and other public sources. They are indicative and updated as often as possible. While every effort is made to ensure accuracy, Construction Foresite Ug. cannot guarantee that all figures reflect real-time changes. Please confirm directly with vendors before purchase.