top of page

Uganda’s Roads Have a Drainage Problem - and Sunday’s Floods Exposed It Again

Oct 13
1 min read
Uganda road drainage failures exposed by October floods at Lubigi and along the Kampala–Gulu Highway highlight the need for resilient roads and effective stormwater management.

Sunday’s heavy rainfall once again exposed the vulnerability of Kampala’s road network, with flooding at Lubigi wetland disrupting movement along the Kampala–Hoima Highway. The incident left sections of the road waterlogged, contributed to congestion and minor accidents, and concealed hazards beneath floodwater. The problem extends beyond one location: flooding observed along the Kampala–Gulu Highway after the same period of heavy rain points to a wider road-drainage challenge.


A flooded road
A section of Kampala-Gulu Highway was rendered unusable by the Sunday night downpour. Photo/CFUg

Like we have discussed here before, the construction lesson is that road performance depends on more than the quality of the carriageway. Drainage capacity, culvert sizing and maintenance, stormwater management, wetland protection and the management of surrounding land and feeder roads all influence whether roads remain functional during heavy rainfall. With the effects of intense rainfall placing growing pressure on infrastructure,


Uganda needs to assess drainage as a core component of road design and maintenance rather than a secondary engineering feature. A road that cannot drain effectively is a road whose reliability is compromised, regardless of the quality of its pavement.

Top Stories

creamy_grid_subtle.png
bottom of page