Navigating Governance Transitions in Public Projects
Strengthening institutional integrity and maintaining project momentum must go hand in hand. On complex megaprojects, unintended administrative slowdowns can ultimately compromise the classic project triad: Time, Cost, and Quality.
Routh M-M (PhD.)
Jul 29


Beyond the Shovel: Why 'Planning Debt' and Scope Volatility Are Costing the Ugandan Taxpayer
When flagship infrastructure projects routinely overshoot their budgets, public discourse defaults to a narrative of financial impropriety. While vigilance against corruption is paramount, this singular lens blinds us to a deeper, structural malaise: the systemic tendency to rush complex engineering works into active implementation using superficial, outdated design data to satisfy immediate political milestones and development finance disbursement targets.
Routh M-M (PhD.)
Jul 8


Kabira Dispute: Sudhir’s Meera Investments Secures $741,250 Court Award
In plain terms, the ruling is a reminder that in Uganda’s construction industry, design deliverables must be genuinely usable, not just submitted on paper.
Routh M-M (PhD.)
Jun 10


Beyond the 99% Oil Readiness: Navigating the Construction Industry’s Post-Infrastructure Pivot
As Uganda hits a reported 99% readiness for its first commercial oil production, the construction industry is confronting a significant strategic transition. As the focus moves from building the pipeline to running it, the Ugandan construction sector must ensure its expertise remains relevant to a post-commissioning environment, ensuring the legacy of the oil boom continues long after the first barrel flows.
Erinah Kintu
May 1


Proposed Mbarara Airport Sets the Stage for Uganda’s Next Aviation Phase
The proposed airport footprint is estimated at about 21 square kilometres, with plans indicating two 5.5-kilometre runways and a 3.7-kilometre reserve runway. The strategic rationale presented links the facility to potential South America–Asia traffic flows, with the possibility of offering an additional routing option via western Uganda.
Routh M-M (PhD.)
Feb 22


SGR Financing Push Builds Momentum Although June 2026 Close Looks Tight
Momentum is clearly building around the Eastern Route SGR, but full bankability will ultimately hinge on how quickly the financing stack crystallises over the next 12–18 months.
Routh M-M (PhD.)
Feb 20


Is it Time to Rethink the Manual? Why Uganda’s Topography Demands a New Approach to Road Design
When a highway or urban artery is constructed along a lower slope or valley floor, it naturally becomes the lowest hydraulic point in that localized system. If the uphill feeder networks remain unpaved, un-stabilized, and lacking basic drainage, every heavy storm triggers high-velocity runoff. This runoff carries heavy loads, including debris, rubbish, silt and mud wash down the slopes.
Routh M-M (PhD.)